Custom felt product development for your brand

You have an idea for a felt product that does not yet exist, or an existing product you want to switch from plastic, PU or cotton to felt. We take it from sketch to series production.

We tell you early if felt is the wrong material for the job.

What development includes

Pattern and details

From sketch or sample to a pattern and technical sheet, with suggested thickness and construction.

Tooling

Die-cut tools or CNC programmes for repeatable shapes.

Prototype and series

Prototype, changes, pre-production sample and series at a factory suited to the product.

Stages

  1. 1

    Brief

    Use, sizes, quantity, target price and claims.

    day 0
  2. 2

    Feasibility

    Material proposal and rough price.

    3–5 days
  3. 3

    Prototype

    A first sample with your feedback.

    10–20 days
  4. 4

    Pre-production sample

    The final reference for the series.

    7–14 days
  5. 5

    Series

    Production, inspection and shipping.

    15–35 days + transit

What development usually costs

ItemWhen it appliesWho pays
PrototypeNew patterns and shapesClient; credited against the order when agreed
Die-cut toolRepeated shapesClient, once; kept for reorders
Dyeing lotA colour that is not on the cardIncluded in the price above the mill minimum
TestingToys, panels, claimsClient, at laboratory cost

We quote every item in advance.

Frequently asked questions

Do you sign an NDA?

Yes, before you share drawings.

What is the minimum for a new product?

Usually 300–1,000 pieces, depending on complexity and tooling.

Can you replace plastic parts with felt?

Often, particularly for inserts, trays and cases. We test whether felt survives the real use before recommending it.

Tell us what you want to make in felt

A product idea, a quantity and your logo are enough. You get delivered prices, minimums and lead times within 2 working days.

Request a quote

Send your product idea, quantity and logo. We reply with prices delivered to your country, minimum quantities and lead times.

  • Reply on working days, usually within a few hours
  • Prices delivered to your door, customs and VAT included in the calculation
  • Written offer within 2 working days

What happens next

  1. 1
    Offer with prices and MOQs1–2 working days
  2. 2
    Samples to your address7–14 days
  3. 3
    Production and inspection15–35 days
  4. 4
    Shipping, customs, deliveryrail/sea 25–45 days, air 7–12
Felt Tote Bag in Four Sizes, Up to 40 × 30 × 15 cmA4 Felt Document Case, 33 × 26 cm, 3 mmHot-Pressed Polyester Felt Dome Lampshade, 75 cm
  • 188 catalogue products, private label from 100 pcs
  • EU company: VAT invoice, customs and GPSR handled
  • Write to us in your language